








🛢️ Drive smarter, last longer – the oil your engine deserves!
VALVOLINE 787007 is a premium full synthetic 5W-30 motor oil engineered with innovative anti-wear additives delivering 50% more wear protection than industry standards. Its advanced detergent system fights sludge buildup, while superior antioxidants ensure oil stability under extreme temperatures and conditions, making it ideal for professionals who demand reliable engine performance and longevity.










| ASIN | B00GZKC6DS |
| Automotive Fit Type | Universal Fit |
| Brand | Valvoline |
| Brand Name | Valvoline |
| Compatible with Vehicle Type | Car |
| Container Type | Bottle |
| Customer Reviews | 4.8 out of 5 stars 10,652 Reviews |
| Flash Point | 394 Degrees Fahrenheit |
| Flash point | 394 Degrees Fahrenheit |
| Global Trade Identification Number | 00074130032125 |
| Included Components | Engine Oil |
| Item Type Name | Engine Oil |
| Item Weight | 4.08 kg |
| Liquid Volume | 5 Quarts |
| Liquid volume | 5 Quarts |
| Manufacturer | Valvoline |
| Manufacturer Part Number | 881164 |
| Model Number | 881164 |
| Package information | Bottle |
| SAE J300 Viscosity Grade | 5W-30 |
| Size | 5 qt |
| UPC | 074130032125 |
| Unit Count | 160.0 millilitre |
| Vehicle service type | Car |
L**.
Full Synthetic Oil
Great find for a greater price. I love these. Fast shipping and reliable Seller
J**T
Just right for me
It was the right product
J**L
Buen producto
Tardo mucho en enviar mi producto casi un mes , pero es buen producto solo el vendedor demoró mucho la entrega
M**T
غير محكم الاغلاق
وصل المنتج غير محكم الاغلاق...تسريب زيت من العبوة
S**R
“Reliable Full‑Synthetic for my F‑150 DIY Maintenance”
I picked up this oil because dealership service costs keep rising, and I prefer having full‑synthetic stock on hand for scheduled and unscheduled maintenance on my F‑150. The shipment included four 5‑quart jugs of Valvoline Advanced Full Synthetic 5W‑30, all factory‑sealed and packaged tightly. No leaks, no cracked caps, and none of the shipping failures other reviewers have mentioned. From a technical standpoint, this oil meets the current Ford WSS‑M2C961‑A1 spec and covers all the API SP/GF‑7A requirements for modern turbocharged engines. The jugs were clean, date‑coded, and ready to use. Packaging integrity matters when storing oil long‑term, and these arrived in ideal condition for shelf storage. This is a solid option for vehicles that require advanced thermal stability and deposit control, especially turbocharged engines that run hotter and benefit from a stronger additive package. It’s also a good fit for DIY owners who keep extra quarts on hand for mid‑interval top‑offs or full changes. It may not be necessary for older engines that don’t require synthetic or for anyone who relies exclusively on dealership service. Overall, this is a reliable full‑synthetic oil with the right certifications for modern Ford engines, and it’s a smart buy if you maintain your own truck and want quality oil ready to go.
Trustpilot
1 week ago
2 weeks ago