---
product_id: 255998275
title: "Long Lead Acid Battery (18 Ah/12 Volt)"
brand: "long"
price: "₱4139"
currency: PHP
in_stock: false
reviews_count: 6
url: https://www.desertcart.ph/products/255998275-long-lead-acid-battery-18-ah-12-volt
store_origin: PH
region: Philippines
---

# 12 Volt reliable output 18 Ah capacity powerhouse Compact & sleek design Long Lead Acid Battery (18 Ah/12 Volt)

**Brand:** long
**Price:** ₱4139
**Availability:** ❌ Out of Stock

## Summary

> 🔋 Power up your life with Long’s lasting energy boost!

## Quick Answers

- **What is this?** Long Lead Acid Battery (18 Ah/12 Volt) by long
- **How much does it cost?** ₱4139 with free shipping
- **Is it available?** Currently out of stock
- **Where can I buy it?** [www.desertcart.ph](https://www.desertcart.ph/products/255998275-long-lead-acid-battery-18-ah-12-volt)

## Best For

- long enthusiasts

## Why This Product

- Trusted long brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Built to Last:** 3-5 years floating life means fewer replacements and more peace of mind.
- • **Consistent Voltage:** Stable 12 Volt output ensures seamless compatibility with UPS, elevators, and backup systems.
- • **Space-Savvy Design:** Compact construction fits effortlessly into tight spaces without compromising performance.
- • **Enduring Powerhouse:** 18 Amp Hours to keep your devices running longer without a hitch.
- • **Quality You Can Trust:** Each battery is rigorously tested to exceed manufacturer specs for ultimate reliability.

## Overview

The Long Lead Acid Battery (18 Ah/12 Volt) delivers dependable, long-lasting power with a compact design ideal for UPS, elevators, and backup systems. Engineered for durability with a 3-5 year floating life and tested to exceed strict manufacturer standards, it’s the smart choice for professionals who demand reliability and efficiency.

## Description

Long Battery Lead Acid replacement batteries meet and even exceed the strictest device's manufacturers specification needs, to ensure It's high standard quality, meaning taking care from all row material and components to the final product, tested automatically one by one. It has a long lasting work life 3-5 years floating time range. This is compatible with ups, elevators, backup power etc.

Review: Excellent and cheap - Best product as described
Review: جدا ممتازه - ممتازه وانصح فيها

## Features

- Brand: Long
- Sleek design
- Compact construction
- Seamless functionality

## Technical Specifications

| Specification | Value |
|---------------|-------|
| ASIN | B00P2A49IC |
| Battery Capacity | 18 Amp Hours |
| Battery Type | Lead Acid |
| Battery capacity | 18 Amp Hours |
| Battery cell composition | Lead Acid |
| Best Sellers Rank | #39,169 in Automotive ( See Top 100 in Automotive ) #60 in Automotive Replacement Batteries |
| Brand | LONG |
| Brand Name | LONG |
| Customer Reviews | 3.9 out of 5 stars 18 Reviews |
| Item Weight | 0.33 Pounds |
| Item weight | 0.33 Pounds |
| Manufacturer | Long |
| Manufacturer Part Number | WP18-12SHR |
| Model Number | WP18-12SHR |
| Number Of Cells | 6 |
| Number of cells | 6 |
| Unit Count | 1.0 Count |
| Voltage | 12 Volts |

## Product Details

- **Battery cell composition:** Lead Acid
- **Brand:** LONG
- **Item weight:** 150 g
- **Number of cells:** 6
- **Voltage:** 12 Volts

## Images

![Long Lead Acid Battery (18 Ah/12 Volt) - Image 1](https://m.media-amazon.com/images/I/61t3b0iv6lL.jpg)

## Customer Reviews

### ⭐⭐⭐⭐⭐ Excellent and cheap
*by A***I on 9 September 2025*

Best product as described

### ⭐⭐⭐⭐⭐ جدا ممتازه
*by ن***ي on 1 March 2024*

ممتازه وانصح فيها

### ⭐⭐⭐⭐⭐ Very good
*by U***1 on 15 April 2026*

Very good

## Frequently Bought Together

- Long Lead Acid Battery (18 Ah/12 Volt)
- Long Battery Lead Acid AGM 9Ah/12 Volt
- Long AGM 4.5 Ah/6 Volt Battery Lead Acid

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.ph/products/255998275-long-lead-acid-battery-18-ah-12-volt](https://www.desertcart.ph/products/255998275-long-lead-acid-battery-18-ah-12-volt)

---

*Product available on Desertcart Philippines*
*Store origin: PH*
*Last updated: 2026-11-26*